This facility was designed to consolidate multiple Department of Ecology (ECY) functions into one centrally located building, providing faster response times to critical spill events. It develops the southwest corner of the city block currently occupied by the ECY Eastern Region Office in Spokane. Site Development, Building Orientation, Building Scale, Material Selections, and Building Layout were all considered in design for this relatively small, utilitarian building to accommodate three important factors: Sensitivity to the Residential Neighborhood; Maintaining a Sense of Campus Design and Security; Providing Good Stewardship of Public Funding through sustainable design.
Amenities and functions of this facility include:
The building is fully fire-sprinkled in both conditioned and non-conditioned spaces
ZBA Architecture was the design lead on this progressive design-build project that was credited as the first Washington State owned NetZero building. It also received a LEED Silver certification.